- You are here:
- Home
- Departments
- Engineering & Public Works
- City Projects
City Projects
Active City Projects
-
Meredith Drive- 128th Street to 142nd Street
Proposed is the construction of a four-lane roadway for Meredith Drive, beginning at 128th Street and extending west to 142nd Street.
Link to page -
100th Street Interchange
Proposed is the construction of an interchange at 100th Street and Interstate 35/80. In 2017 the ramps would be graded and in 2018 the ramps would be paved.
Link to page -
Waterford Road - 156th to 170th
This project would provide for the reconstruction of Waterford Road from 156th Street west to 170th Street as a four-lane roadway with left turn lanes including grading, storm sewer and a new bridge.
Link to page
-
Aurora Ave - 128th to 142nd
This project would include the extension of the box culvert, storm sewer, and earthwork for the installation of a sidewalk on the south side of Aurora Avenue from 128th Street to 142nd Street. This project will occur in June and July
Link to page -
86th Street Preservation Project
This project would provide for the patching and overlay of 86th Street from Aurora Avenue to the north corporate limits.
Link to page -
2018 PCC Patching Program
The PCC Patching Program will provide full depth patching at locations identified in the 2018 Pavement Management Report.
Link to page -
Brookshire Stream Restoration
A stream mitigation project is being constructing in a City park known as the Brookshire Open Space. This project will provide for rock checks installed across the channel to create a stable channel slope. This work will supplement previous grade control work in the stream. Project plans call for the removal of non-native species (such as honeysuckle) and plant native species to improve the habitat within the riparian corridor.
Link to page